The MDRA came from Calgary today with a new trainee MDRA inspector. They did the 2 inspections with very few comments, all positive. Builder portion came up to 76% by their logic. Im cleared to cover at my discretion, although I am a long way from doing so. Mostly, I just wanted to be able to rivet the wing closed, and get the other one on the rotisserie. I need to run the nav light wires and install a pitot tube first. I got the PET cable loom today and prepared it for installation with a string inside to pull wires through.